|
RAYCONTROL PTE LTD |
|
|
HANLA IMS CO., LTD. Projects for :- New ExxonMobil Marine Environmental, Safety and Quality Criteria (MESQAC) requirements :- The bunker tank levels must be displayed in the Cargo Control Room. The Cargo and Slop Tank Pressures must be displayed on a monitor with alarm on the Bridge. “Criteria Ref No. H 27 - It is Strongly Preferred that vessels are fitted in their Cargo Control Room with a device capable of monitoring and recording the load / discharge manifold pressure”.
|
|
